Archives

Category Archive for: ‘Case Studies’
UK’s Largest Cold Store Open for Business

Friargreen were pleased to be asked by a European client to assist with the site project management of the construction of the Uk’s largest automated cold store facility.

Located just outside Wisbech, Cambridgeshire the cold store operated by Partner Logistics measures 175 metres long by 88 metres wide and stands at 36 metres tall.

The building operates with a fully automated pallet picking system and can store 77,000 pallets at a temperature of -27 degrees.

With our experienced team we were able to work with our client to enable the successful completion of this state of the art facility from the piling stages right through to the frozen food being delivered.